1. Product Introduction
· Dongfeng Tianjin luxury cab truck, Cumings 190HP diesel engine, 10.00-20 tires, air brake
· Garbage loading from rear of truck, with rear turnover mechanism
· Garbage offloading: the garbage is pushed out by the push plate inside truck garbage box
· Control system: Electronic control box, more convenient; and also mounted operation levers, mechanical hydraulic operation, more reliable
· Chasiss brand optional: HOWO, DONGFENG, JMC, FOTON, SHACMAN, JAC, JAPAN BRAND, LIUQI CHENGLONG, etc
2.Product Specification
Vehicle parameters |
|||
Vehicle Model |
CLW5141ZYSE |
Vehicle Brand |
CLW |
Overall dimensions |
8535x2490x2980mm |
Curb weight |
8705kg |
Loading capacity |
12m3 |
||
Chassis parameters |
|||
Chassis model |
EQ1141KJ |
Chassis brand |
DONGFENG |
Overall dimensions |
7600x2462x2710mm |
Wheel base |
4500mm |
Front/rear wheel track |
1940x1860mm |
Front/rear suspension |
1205/1895mm |
Approach/departure angle |
25/18° |
Maximum speed |
90km/h |
Chassis Manufacturer |
Dongfeng Motor Company |
||
Cab |
Configuration |
A row and a half deluxe cab(with sleeping berth),allowable 3 passengers |
|
Color |
Blue,other color is optional | ||
Engine |
Model |
B190 33 |
|
Emission |
Euro 3 | ||
Type |
6 cylinders, in-line,4-stroke,water-cooled,turbo inter-cooling,diesel engine | ||
Rated power |
190hp,rated power speed 2500rpm | ||
Displacement |
5900ml | ||
Max.torque |
640N.m | ||
Bore x stroke |
102x120mm | ||
Manufacturer |
Dongfeng Cummins Engine Co., Ltd. | ||
Tire |
Size |
10.00-20-16 nylon tire |
|
Number |
6+1 nos | ||
Frame |
(250×80×7)mm,parts are double layers. |
||
Fuel tank |
160L,steel |
||
Front axle |
5.0T |
||
Rear axle |
10.0T |
||
Drive form |
4X2 |
||
Rated voltage |
24V,DC |
||
Transmissions |
Gearbox 8JS85E, 8 speed forward 1 reverse. |
||
Steering device |
Power assisted steering |
||
Steering wheel |
Left hand drive |
||
Selective configuration |
Air Conditioner,steel wire tire,new driver’s cab |
||
If there is a slight change in the chassis parameters above,please take the actual product as the standard |
|||
Upper structure parameters |
|||
Equipment |
|||
Structure |
Body, sub frame, lifting rear part, the loading device, the pushing-out plate, hydraulic and electric systems |
||
Loading capacity |
12m3 |
||
System of loading |
Mechanized, rear loading |
||
Modes of the pressing |
Manual,semi-automatic,automatic,lifting rear part operation manual,loading,pushing,pressing, pushing out automatic |
||
Body |
|||
Version |
All-metal |
||
Shape |
arc-shaped |
||
Sidewalls |
Sheet carbon steel (thickness: 4 mm) |
||
Bottom |
Sheet carbon steel (thickness: 4 mm) |
||
Roof |
Sheet carbon steel (thickness: 4 mm) |
||
Front frame |
Sheet carbonaceous steel (thickness: 5 mm) |
||
Rear frame |
sheet carbon steel (thickness:5 mm) |
||
Basis |
120x120mm (thickness: 5 mm) |
||
Loading bunker |
|||
Loading bunker |
All-metal with sidewalls and a loading ladle |
||
Volume |
1.2 m3 |
||
Sidewalls |
Sheet carbon steel (thickness: 4 mm) |
||
Ladle floor material |
Sheet carbon steel (thickness: 4 mm) |
||
Liquid drain |
Drainage channel,sewage tank |
||
Working zone Lighting |
2 lamps |
||
Mechanism of raising |
Two hydraulic cylinders |
||
Ensuring tightness |
Between the body and lifting back part in the lower part profile acid-proof rubber is used. |
||
Pressing system |
|||
Features |
Control mode diversification,bidirectional compression |
||
Pressure |
16Mpa |
||
Compaction ratio |
3.0:1 |
||
Loading cycle |
25-30 second |
||
Unloading cycle |
15-20 second |
||
pressing mechanism |
The giving plate and hinge related pressing plate moving on two directing bars |
||
Pressing mode |
Automatic pressing (1 full cycle and continuous pressing) and controlling of each cycle of pressing separately |
||
Control of pressing |
Control from the external panel on the bunker |
||
Lifting rear part |
|||
Mechanism of lifting |
Two hydraulic cylinders |
||
Function description |
Suitable for various rubbish bins |
||
Others |
|||
Color and Logo |
Optional |
||
Standard configuration |
Chassis,arc-shaped body,sub frame,rear lifting part,loading bunker,pushing-out plate,hydraulic system,pressing system,sewage tank,climbing ladder,pneumatic control. |
3.Truck Structure and Operation
4. Company Introduction
ChengLi Group, located in the Southern Suburb of Zengdu District, Suizhou City, is a diversified group company integrating automobile technology research and development, automobile manufacturing, automobile modification, auto parts, finance, education and home investment.
CLW Group "CHENGLIWEI" brand special trucks are the best sells in whole nation, and exported to South America, the Middle East, Central Asia, Southeast Asia, Africa, more than 30 countries and regions.
CLW Group "CHENGLIWEI" brand products occupy an important share in the domestic and international market. The leading products include: all kinds of water trucks, garbage trucks, suction sewage trucks, road sweeper trucks, fuel tank trucks, chemical trucks, wrecker trucks, aerial work trucks, fire trucks, truck mounted crane, refrigerated trucks, van trucks,LPG(pressure vessel), highway maintenance trucks, flatbed transport trucks, bulk grain trucks, stage trucks, LED advertising trucks, mobile sales truck, heavy duty truck mounted crane, concrete pump trucks, drug transport trucks, new energy trucks, and other series of more than 800 varieties.
5. Certificates
We have passed certifications of ISO9001-2008 Quality Management, ISO 14001 Environmental Management, OHSAS18001 Occupational Health And Safety Management System Certification, 3C Mandatory Certification, GJB9001B-2009 Euro Military Standard Certification and Confidentiality Certification (national level 3), the Bational Weapons and Equipment Production License, Energy-saving Environmental Certification, Automotive Exemption Certification, the US Mechanical Rngineer Asme (ASME) Certification, the EU Agreement ADR Certification. We have obtained production license qualification for special trucks including : A2, C2, C3 pressure vessels, truck mounted crane, crane trucks, fire trucks, buses, new energy vehicles production and other qualifications.
Certificates:
6. FAQ
1. What is the term of delivery?
Answer: EXW, FOB, CIF, DAP.
2. What is the payment term?
Answer: FOB,CIF,DPA; T/T, 30% in advance and 70% balance before shipping.
3. How about the delivery time?
Answer: Commonly, it takes 15~35 days of production after the receipt of your advance down payment and 7 days for delivering after full payment.
4. What is the warranty time?
Answer: 12 month from the date of supply for vehicles; technical support and spare parts supply liftlong.
5. What is the packaging?
Answer: bulk ship, ro-ro ship, container ship, flat rack, etc.
Professional, economic and safe methods and measures to package trucks or equipments.
6. Can we supply samples if customers need sample in advance?
Answer: If we just right have the sample in stock, we can supply it for you. But the customer need pay for the cost.
7. How to establish a long term cooperation?
Answer: We try our best to guarantee great quality and good price policy for our old customers to ensure the benefits of our customers. Moreover, we respect every customer and sincerely do business, making friends with them, no matter who they are, wherer they are from.
[wpcc-script src="https://www.clstrucks.com/js/Inquiry/en.js" type="text/javascript"][wpcc-script src="https://www.clstrucks.com/js/24883/pcfeedback569804.js" type="text/javascript"]
-
Mini Garbage Truck
-
Small Garbage Truck
-
Garbage Compactor Truck
-
Side Loader Garbage Truck
-
Electric Garbage Truck
-
ISUZU Good Garbage Truck