Introduction Chassis description 1. The asphalt pump and pipeline must be cleaned when the distributor completes one operation or changes the construction site, otherwise it will not work next time. 2. Before spraying, the distributor must check whether the valve positions are correct. The hot bitumen added into the bitumen tank must reach a working temperature of 160~180℃. For long-distance …